A Compact Checklist for Lot Grading and Building Permit In and Around the Ontario region

Grading Plan

“Thinking of researching on the web before consulting your municipality for your site plan? Then you are at the right place, my friend”.

Constructing that perfect house in Caledon could be tough as it’s a developing urban area whilst major places are still rural. But if you have the right knowledge about everything that are generally needed for the construction and get the proper guidance from your architects, it won’t be such an unattainable business. Always go for professionally licensed engineers who have vast experience in site designing plans. But before beginning any construction project, always check with the Inspection Officer for all the specific requirements.

Now the first thing you would need for your site is the grading plan. You must follow the protocols needed in grading plan Caledon. No need to get worried, I am here to guide you with all the steps.

Grading plan Caledon Checklist:-

* Grading and drawings must be signed and stamped by a professional engineer, certified and licensed in your area.

* Property lines, land uses.

* Walkways, driveways, parking areas.

* On-site buildings and structures, on adjacent properties as well.

* Watercourses, drainage system

* Proposed underground services and utilities of all.

* Site elevations on-site and adjacent areas.

* Stormwater management features which must meet the criteria with the Caledon municipality.

* Entrances and exits of all the buildings.

* Decreasing in the corrosion level and sedimentation control measures used during and post-construction.

While talking about grade plan I am also going to mention grading plan Vaughan.

* If it’s residential, the lot grading staff will address to the residential drainage system and private constructions.

* They will look after the review and acceptance of any site alteration plan.

* Drainage and pool permit evaluation

* Subdivision consultation of final lot grading certification survey.

* Solving complaints and enquires related to residential lot grading.

* Clearance letters of onsite additions, pools are also looked after by the lot grading staff.

So these are the few factors, which should not be missed out for your grading plan Vaughan.

Mentioning the last but not the least point here i.e., Basement Finish Permit Vaughan.

You will require a building permit for completion of basement areas for relocation of existing or new plumbing fixtures.

Requirements:-

* The homeowner or a qualified designer, architect or professional engineer must submit the drawings including related documents and information abiding by the Building Code for building permit.

* If drawings are prepared by a qualified designer, then it must include-

  1. The name of the qualified designer
  2. The registration number of the qualified designer
  3. The qualified designer’s qualification number
  4. Signature of the qualified designer
  5. A statement verifying that the designer has taken responsibilities for the design activities.

* Construction plan should be indicating:-

  1. Sizes of windows and doors
  2. Layout of bathrooms
  3. Location of stairs, furnace
  4. Existing or new overheads and beams location
  5. Ceiling heights
  6. Sizes of new beams and supports
  7. New or relocated fixtures sizes
  8. New interior and exterior wall construction

* Other requirements:-

  1. Construction and demolishing permit application
  2. Residential permit data
  3. Sewage system information form
  4. Any additional documents pertaining to the project

So this is a brief description of all the requirements you need to attend to finish your private little home. I hope that this blog was helpful for you all. The major thing is that you need to be really helpful when it comes to these kinds of constructions. One thing gets missed by you and you can land up in trouble. To know about such mistakes, do read my next blog. I would be happy to help you regarding building permits as well.

Leave a Reply

Your email address will not be published. Required fields are marked *